4.1.14. Removal and installation of support of the power unit

Forward support

Forward support

1 — a support (pillow)
2 — an arm
3 — bolts
4 — a nut

Removal

 PERFORMANCE ORDER

  1. The car also establish to Poddomkratta it on props.
  2. Prop up the engine a jack, for distribution of loading having laid the wooden block between a head of a jack and the pallet of a case.

At a poddomkrachivaniye of the engine be careful, - if to lift the engine too highly, wires, driving cables, and also radiator and fuel hoses will be loaded.

  1. Give a nut of fastening of a pillow of a support of the engine to an arm, remove a washer.
  2. Give bolts of fastening of a support of the engine to the car chassis.
  3. Slightly raise the engine and remove its support.
  4. In case of need the arm can be removed from the engine after an otdavaniye of fixing bolts.

The rubber support of the engine moistened with oil are subject to replacement. At the same time it is necessary to define and remove the leak cause in order to avoid bystry failure of a new support.

Installation

Installation is made upside-down.

 PERFORMANCE ORDER

  1. If the arm of a support was removed from the engine, establish it into place and tighten fixing bolts with effort of 77 ÷ 98 Nanometers.
  2. Do not tighten other fixture with final effort (77 ÷ 98 Nanometers) until all mass of the engine is not postponed for its support.

Back support

Arrangement of back support of the power unit on a cross beam of the chassis

Removal

 PERFORMANCE ORDER

  1. The car also establish to Poddomkratta it on props.
  2. Prop up transmission a jack, for distribution of loading having laid the wooden block between a head of a jack and a case of transmission.
  3. Give nuts of fastening of a support to a cross beam.
  4. Give bolts of fastening of a support to transmission.
  5. Slightly raise transmission, watching to damaging an electrical wiring or the panel of a floor and remove a support from transmission.

The rubber support moistened with oil are subject to replacement. At the same time it is necessary to define and remove the leak cause in order to avoid bystry failure of a new support.

Installation

 PERFORMANCE ORDER

  1. Installation is made upside-down.
  2. Do not tighten fixture with final effort in 77 ÷ 98 Nanometers until all weight of the power unit is not postponed for support.