798646e1

12.4.3. Service of assembly of the back bridge

Removal and installation

Models Hardtop (Hardtop) and Station Wagon

Removal

 PERFORMANCE ORDER

  1. Weaken nuts of fastening of back wheels.
  2. Car back also establish to Poddomkratta it on the props got under frame elements. Remove back wheels.
  3. Turn out a drain stopper and lower oil from a case of the back bridge.
  4. Mark position of the back driveshaft concerning a flange of the leading gear wheel and a drum of the parking brake. Disconnect the driveshaft and take it from under the car.
  5. Release a collar and disconnect a ventilating hose from a case of the back bridge.
  6. Disconnect a brake tube from a flexible brake hose, release a fixing clip and release a hose from a basic arm. Zakuporte the open ends of a tube and hose in order to avoid hit in the hydraulic brake system of dirt.
  7. Disconnect a valve spring - pressure regulator from an arm on a case of the back bridge.
  8. By means of two supports or jacks prop up the bridge in horizontal position.
  9. Give fixing nuts, remove washers and disconnect the lower support of shock-absorbers from a case of the back bridge.
  10. Give a nut, remove a washer, then, having hooked the lever, separate a cross jet bar from a bridge case.
  11. Give nuts and disconnect racks of the stabilizer of cross stability from its bar.
  12. Give nuts and bolts of fastening of the top and lower longitudinal jet bars of a suspension bracket to a bridge case.
  13. Omit assembly of the bridge and remove screw springs and their rubber saddles. Remember adjusting provisions of springs.
  14. By means of the assistant take the bridge from under the car.

Installation

Installation is made upside-down.

 PERFORMANCE ORDER

  1. Bring assembly of the back bridge to adjusting situation, then insert bolts of fastening of the lower jet bars of a suspension bracket, however do not tighten a nut at this stage.
  2. Establish on the places screw springs with saddles. Track correctness of placement of components. Prop up the bridge a jack.
  3. Establish the top longitudinal jet bars, a cross jet bar and shock-absorbers, however do not tighten fixing nuts at this stage.
  4. Connect a bar of the stabilizer of cross stability to racks, tighten fixing nuts with effort of 32 ÷ 38 Nanometers.
  5. Install the driveshaft (the sliding joint forward). Track correctness of combination of the landing tags put in the course of dismantle. Tighten fixing nuts and bolts with effort of 93 ÷ 108 Nanometers.
  6. Connect a ventilating hose and a brake tube, pump over hydraulic system.
  7. Fill in necessary amount of oil of the required grade in a bridge case.
  8. Lower the car on the earth and tighten with demanded (see size tables and adjustments at the end of the Management) effort of a nut of fastening of longitudinal jet bars, shock-absorbers and a cross jet bar.

Utiliti's (Van) models and Cab Chassis

Components of assembly of the back bridge of models of Utiliti (Van) and Mini-truck
1 — assembly of the main transfer
2 — an anchor finger
3 — a step-ladder
4 — the shock-absorber
5 — an earring
6 — a spring
7 — a bridge case

Removal

 PERFORMANCE ORDER

  1. Weaken nuts of fastening of back wheels.
  2. Car back also establish to Poddomkratta it on the props got under frame elements. Remove back wheels.
  3. Turn out a drain stopper and lower oil from a case of the back bridge.
  4. Mark position of the back driveshaft concerning a flange of the leading gear wheel and a drum of the parking brake. Disconnect the driveshaft and take it from under the car.
  5. Release a collar and disconnect a ventilating hose from a case of the back bridge.
  6. Disconnect a brake tube from a flexible brake hose, release a fixing clip and release a hose from a basic arm. Zakuporte the open ends of a tube and hose in order to avoid hit in the hydraulic brake system of dirt.
  7. Give fixing nuts, remove washers and disconnect the lower support of shock-absorbers from basic plates of springs.
  8. Give nuts of U-shaped bolts and remove basic plates of step-ladders of springs.
  9. Prop up a bridge case horizontally two supports or jacks.
  10. Give nuts and disconnect racks from a bar of the stabilizer of cross stability.
  11. Give fixing nuts and, supporting springs, take plates of earrings and fingers from their back ends and arms of the chassis. Lower the back ends of springs on the earth.
  12. By means of the assistant take assembly of the bridge from under the car.

Installation

Installation is made upside-down.

 PERFORMANCE ORDER

  1. Track correctness of placement of a case of the bridge on the central bolts of springs.
  2. Establish fingers, plugs and plates of earrings of springs, however do not tighten fixing nuts at this stage.
  3. Establish U-shaped bolts and basic plates of step-ladders of springs, tighten fixing nuts with effort of 108 ÷ 147 Nanometers.
  4. Install the driveshaft (the sliding joint forward). Track correctness of combination of the landing tags put in the course of dismantle. Tighten fixing nuts and bolts with effort of 93 ÷ 108 Nanometers.
  5. Connect a ventilating hose and a brake tube, pump over hydraulic system.
  6. Fill in necessary amount of oil of the required grade in a bridge case.
  7. Lower the car on the earth and tighten with demanded (see size tables and adjustments at the end of the Management) effort of a nut of fastening of fingers of earrings of springs and shock-absorbers.